Structure Repair | Specialized on pier structural member repair, dimensional and positional repair, off-shore structure repair, Survey/Inspection.
STEAG State Power Inc. |
FLED/DiveCenter Project:
May 8, 2014Survey and inspection of Jetty sacrificial anodes
Scope of work:
- Engagement of services of certified divers for the survey/inspection of sacrificial anodes of the Jetty.
- Post-survey comprehensive report with pictures required.
Provision of underwater services for the of Buoy at Jetty Area.
Scope of Work:
- Underwater inspection of chain link of the remaining not inspected
buoy; - Underwater cutting of deteriorated portion of chain of the remaining
buoy; - Supply and installation of shackles to join the end of the cut portion of
the chain of the remaining buoy; - Chain measurement;
- GPS of the 2 buoys;
- Underwater cleaning / scraping of marine growth of the bottom part of
all the two (2) buoys; - Repainting of all two (2) buoys
April 10, 2014
Cleaning of continuous dosing line of chlorination pipe nozzles.
Scope of work:
- Supervision and supply of personnel and all equipment and consumables for:
- Dismantling and pulling-out of continuous dosing pipe spool nozzles.
- Cleaning of sludge and hardened deposits.
- Re-installation.
April 14, 2014
Provision of services for the re-installation of buoy at Jetty area
Scope of work:
- Establishment of location via GPS.
- Engagement of certified divers.