Monday, June 26, 2006

FLED/DiveCenter @ Holcim Philippines, Luga-it, Misamis Oriental

Holcim Philippines, Inc., Luga-it, Misamis Oriental
 

June 26, 2006 – July 25, 2006

FLED/DiveCenter Project:

  • Underwater survey and inspection of RC piles at old pier.
  • Mobilization, hauling of materials, miscellaneous tools, equipment and underwater safety gadgets from warehouse plant premises to job site.
  • Verification of actual locations, dimensions and measurements at site prior to commencing of the RC piles cleaning activity.
  • Removal or cleaning of marine deposits, barnacles, grease, oil and other contaminants on the four elevations of RC piles above and below water from pier approach and entire of pier head.
  • Preparation and submission of detailed reports of the cleaning and Inspection of RC piles.
  • Photography in four elevations of the RC piles showing defects.