FLED/DiveCenter | Concrete Encasement for Marine Pile Repairs
![]() |
Photo Credits | Paul from PxHere |
Marine piles are vital components of waterfront infrastructure, playing a crucial role in supporting piers, docks, and other marine structures. Over time, these marine piles are subjected to marine environments that can lead to deterioration. One of the most effective methods for repairing and reinforcing these piles is through concrete encasement.
Marine piles are constantly exposed to various conditions, including saltwater, tidal fluctuations, marine organisms, and mechanical wear. These factors contribute to the degradation of pile materials, often leading to issues such as corrosion of steel piles or decay of timber piles. If this is not maintained, the deterioration can compromise the structural integrity and safety of the marine infrastructure.
Concrete encasement involves encasing the damaged section of a marine pile with a layer of concrete. This technique not only repairs the existing damage but also provides additional protection against future deterioration. The process typically includes the following steps:
Preparation of the Pile Surface
Divers begin by cleaning and preparing the surface of the pile to ensure good adhesion of the concrete. This includes removing any loose or damaged material and treating any corroded sections to provide a solid foundation for the encasement.
Installation of Reinforcement
Depending on the structural requirements, steel reinforcement bars or mesh are installed around the pile within the formwork. The reinforcement is crucial for enhancing the structural capacity of the repaired section and ensuring long-term durability.
Placement and Securing of Formwork
Once the pile is prepared, fabric formwork is placed around the pile. This form work is then zipped and secured, creating a mold for the concrete. The bottom of the form work includes a self-sealing turn-up and fillers, which facilitate easy pump filling in a submerged tremie fashion.
Pouring of Concrete
The formwork is then filled with a specially designed micro-concrete mix. This concrete mix is pumped into the formwork, encapsulating the pile. The mix is designed to have a low water-cement ratio, typically around 0.4, to ensure high durability against marine conditions such as carbonation and chloride ion penetration.
Curing and Finishing
Once the concrete is poured, it is allowed to cure and harden. The formwork protects the concrete during this curing process. Depending on the project's requirements, the formwork can either be left in place or removed once the concrete has set, providing either a protective layer or an aesthetic finish to the pile.
Concrete encasement provides several key benefits for repairing marine piles, including enhanced durability against harsh marine environments, improved structural capacity through the addition of reinforcement, and cost-effectiveness with minimal operational disruption. This technique can be applied to various pile types, offering long-term protection and ease of installation using advanced fabric formwork systems.
These advantages ensure the longevity and stability of marine infrastructure, making concrete encasement a practical and efficient repair method.
COMMENTS